Beğendik Botan Bridge

9

Date

2014

9

Employer

Ministry of Transport and Infrastructure General Directorate of Highways

9

Scope

Bridge, Civil Engineering Structures Design Projects

9

Location

Siirt, Türkiye

9

Type

Bridge

9

Construction Area

Length: 450m, Abutment Height: 165m

9

Türkiye’s longest mid-span post tensioned bridge with a balanced cantilever

agm@agm.com.tr